How do I Complete a Hazard?
A Hazard can be closed once Risk Assessments have been completed and Controls have been implemented.
- Click on EHS > Hazards
- Edit the Hazard
- Click on the Finalise and Sign off tab
- Make sure the Controls in each Risk Assessment have been implemented.
- Add a comment
- Take or Upload photos of the measures used to close the Hazard
- Draw your Signature
- Click Confirm